Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2012: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2011: ¥2,990,000 (Direct Cost: ¥2,300,000、Indirect Cost: ¥690,000)
|
Research Abstract |
In this research, the ultra-high availability beam operation system for the next generation large scale accelerator has been studied. This system is based on the innovative alarm system. During the beam operation at KEK electron/positron injector linac, the large number of operation data has been stably acquired via EPICS control system framework. We have obtained knowledge on the feasibility of high-efficient feedback operation using the on-line beam simulation and fast diagnostic system to real beam operation.
|