Budget Amount *help |
¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2012: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2011: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Research Abstract |
This research dealt with 13 examples where the note of characters, such as the date, a name of a person and length, remained in connection with a red line among the quarries in ancient Egypt, and considered the difference and common feature of the method of labor record in the quarry of the New Kingdom period and the Ptolemaic period. As a result of consideration, in the New Kingdom period, the character was simple instead of being innumerably underlined with the red line, and in the Ptolemaic period, it turned out that the amount of information of a character increases instead of a red line decreasing. In addition, it was also clarified that measurement of the amount of excavation was commonly performed by a cubic cubit in each period. This point is concluded to be succession of the quarrying works from the New Kingdom period to the Ptolemaic period.
|