Budget Amount *help |
¥163,410,000 (Direct Cost: ¥125,700,000、Indirect Cost: ¥37,710,000)
Fiscal Year 2016: ¥27,690,000 (Direct Cost: ¥21,300,000、Indirect Cost: ¥6,390,000)
Fiscal Year 2015: ¥27,950,000 (Direct Cost: ¥21,500,000、Indirect Cost: ¥6,450,000)
Fiscal Year 2014: ¥36,400,000 (Direct Cost: ¥28,000,000、Indirect Cost: ¥8,400,000)
Fiscal Year 2013: ¥36,400,000 (Direct Cost: ¥28,000,000、Indirect Cost: ¥8,400,000)
Fiscal Year 2012: ¥34,970,000 (Direct Cost: ¥26,900,000、Indirect Cost: ¥8,070,000)
|
Outline of Final Research Achievements |
Material development methodology called Reverse 4D Material Engineering (R4ME) has been established. We have divided the optimization targets into two cases; "microstructure cluster control" and "single microstructure control" to make R4ME applicable to various issues in the materials and mechanical engineering. In particular, we have created a data coarsening method, optimization method and R4ME methodology appropriate for adapting them. We have shown that R4ME enables to use the information about a huge number of microstructural features embedded in one high-resolution 3D image as big data. The optimization of polycrystalline microstructure is also possible by employing the polycrystalline imaging technique.
|