Budget Amount *help |
¥39,260,000 (Direct Cost: ¥30,200,000、Indirect Cost: ¥9,060,000)
Fiscal Year 2014: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2013: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2012: ¥34,580,000 (Direct Cost: ¥26,600,000、Indirect Cost: ¥7,980,000)
|
Outline of Final Research Achievements |
In this study, steady-state and unsteady-state measurement and visualization methods were developed and integrated to establish the foundation for "sports fluid engineering." The critical Reynolds number of a typical football with 32 panels made from pentagonal and hexagonal pieces was found to be approximately 200,000. The lift during a ski jump with an attack angle of approximately 35° was found to be 230 N. We consider these results to be useful and representative of sports fluid data.
|