Long-term evaluation of resettlement programs for large dam construction projects

Research Project

Project/Area Number 24310189
Research Category

Grant-in-Aid for Scientific Research (B)

Allocation TypePartial Multi-year Fund
Section一般
Research Field Area studies
Research InstitutionHosei University

Principal Investigator

FUJIKURA Ryo  法政大学, 人間環境学部, 教授 (10274482)

Co-Investigator(Kenkyū-buntansha) TAKESADA Naruhiko  法政大学, 人間環境学部, 教授 (20553449)
YOSHIDA Hidemi  法政大学大学院, 公共政策研究科, 准教授 (70524304)
WATANABE Miko  法政大学大学院, 公共政策研究科, 講師 (80625210)
中山 幹康  東京大学, 大学院・新領域創成科学研究科, 教授 (10217945)
Project Period (FY) 2012-04-01 – 2015-03-31
Project Status Completed (Fiscal Year 2014)
Budget Amount *help
¥8,320,000 (Direct Cost: ¥6,400,000、Indirect Cost: ¥1,920,000)
Fiscal Year 2014: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2013: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
Fiscal Year 2012: ¥3,120,000 (Direct Cost: ¥2,400,000、Indirect Cost: ¥720,000)
Keywords住民移転 / ダム建設 / 水没補償 / アジア / ダム / 移転補償 / 生活再建 / ダム開発 / 政府開発援助 / 補償 / 社会配慮
Outline of Final Research Achievements

We conducted field surveys on resettlement programs implemented for 17 large dam construction projects in Indonesia, Japan, Lao PDR, Sri Lanka, Turkey, and Vietnam. Except two Vietnamese cases, the resettlements were completed more than two decades ago. The study reveals that securing secondary income source is effective to increase and stabilize resettlers' income. While it is recommend land-for-land compensation for submerged farm land, cash compensation should be considered as a feasible option taking socio-economic situation and intention of the resettlers. Farmers do not necessarily wish to continue farming after resettlement. Improvement of educational environment is generally highly appreciated by the resettlers.

Report

(4 results)
  • 2014 Annual Research Report   Final Research Report ( PDF )
  • 2013 Annual Research Report
  • 2012 Annual Research Report
  • Research Products

    (15 results)

All 2015 2013

All Journal Article (10 results) (of which Peer Reviewed: 10 results) Presentation (2 results) Book (3 results)

  • [Journal Article] The Long-term Impacts of Resettlement Programs resulting from Dam Construction Projects in Indonesia, Japan, Laos, Sri Lanka, and Turkey: A Comparison of Land-for-Land and Cash Compensation Schemes2013

    • Author(s)
      Ryo Fujikura
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 4-13

    • DOI

      10.1080/07900627.2012.741032

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] The Resettlement Program of the Wonorejo Dam Project in Tulungagung, Indonesia: The Perception of Former Residents2013

    • Author(s)
      Dian Sisinggih
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 14-24

    • DOI

      10.1080/07900627.2012.743432

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Livelihood status of resettlers affected by the Saguling Dam Project, 25 years after inundation2013

    • Author(s)
      Sunardi
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 25-34

    • DOI

      10.1080/07900627.2012.738593

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Resettlement and Development: A Survey of Two of Indonesia's Koto Panjang Resettlement Villages2013

    • Author(s)
      Syafruddin Karimi
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 35-49

    • DOI

      10.1080/07900627.2012.739539

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] A Long-term Evaluation of Families Affected by the Bili-Bili Dam Development Resettlement Project in South Sulawesi, Indonesia2013

    • Author(s)
      Hidemi Yoshida
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 50-58

    • DOI

      10.1080/07900627.2012.738495

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] The Livelihood Reconstruction of Resettlers from the Nam Ngum 1 Hydropower Project in Laos2013

    • Author(s)
      Bounsouk Souksavath
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 59-70

    • DOI

      10.1080/07900627.2012.738592

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Reconstruction of the Livelihood of Resettlers from the Nam Theun 2 Hydropower Project in Laos2013

    • Author(s)
      Bounsouk Souksavath
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 71-86

    • DOI

      10.1080/07900627.2012.738792

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Long-term perceptions of project-affected persons: a case study of the Kotmale Dam in Sri Lanka2013

    • Author(s)
      Jagath Manatunge
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 87-100

    • DOI

      10.1080/07900627.2012.738496

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Ataturk Dam resettlement process: increased disparity resulting from insufficient financial compensation2013

    • Author(s)
      Erhan Akca
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 101-108

    • DOI

      10.1080/07900627.2012.738497

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Journal Article] The Long-Term Implications of Compensation Schemes for Community Rehabilitation: The Kusaki and Sameura Dam Projects in Japan2013

    • Author(s)
      Kyoko Matsumoto
    • Journal Title

      International Journal of Water Resources Development

      Volume: Vol.29, No.1 Issue: 1 Pages: 109-119

    • DOI

      10.1080/07900627.2012.738498

    • Related Report
      2012 Annual Research Report
    • Peer Reviewed
  • [Presentation] Long-Term Evaluation of Resttlement Programs of Large Dam Construction in Asia2015

    • Author(s)
      Ryo Fujikura
    • Organizer
      Society for Applied Anthropology
    • Place of Presentation
      Pittsburgh, USA
    • Year and Date
      2015-03-25
    • Related Report
      2014 Annual Research Report
  • [Presentation] Livelihood Rehabilitation of Involuntarily Resettled People by Dam Construction Projects: Cases in Asia2013

    • Author(s)
      Mikiyasu Nakayama
    • Organizer
      US-Japan Research Institute Seminar
    • Place of Presentation
      JSPS/JST Washington Office, Washington DC 20036 (米国)
    • Year and Date
      2013-02-19
    • Related Report
      2012 Annual Research Report
  • [Book] Resettlement Policy in Large Development Projects2015

    • Author(s)
      Ryo Fujikura and Mikiyasu Nakayama (Editor)
    • Publisher
      Routledge
    • Related Report
      2014 Annual Research Report
  • [Book] Restoring Communities Resettled After Dam Construction in Asia2013

    • Author(s)
      Ed. Mikiyasu Nakayama and Ryo Fujikura
    • Total Pages
      128
    • Publisher
      Routledge
    • Related Report
      2013 Annual Research Report
  • [Book] Jin Sato (Ed) Governance of Natural Resoures : Uncovering the social purpose of materials in nature2013

    • Author(s)
      Naruhiko Takesada
    • Total Pages
      252
    • Publisher
      United Nations University Press, Tokyo
    • Related Report
      2013 Annual Research Report

URL: 

Published: 2012-04-24   Modified: 2019-07-29  