Budget Amount *help |
¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
Fiscal Year 2014: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2013: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2012: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Outline of Final Research Achievements |
This study aimed to develop a new device which can detect a buried cultural property under the ground, and to establish the basic technology and to clarify the problems for the practical use. I attached great importance to the easy handling and to the high resolving power. An artificial magnetic field and electric current were sent from the source point, and signals were received at the observation point. This technique is advantageous to perform the simple and easy measurement. High precision data can be obtained by matching a timing of the reception with the transmission. Underground structures can be obtained by the attenuation of the signals.
|