Budget Amount *help |
¥5,590,000 (Direct Cost: ¥4,300,000、Indirect Cost: ¥1,290,000)
Fiscal Year 2014: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2013: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2012: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Outline of Final Research Achievements |
With the aim of making the automatic suction condition optimization system for PM2.5 measurement of stationary sources, it was studied by the following procedure.① Design and make prototype of the "automatic suction flow management system." By a test using a model gas and real gas, evaluated the effect and extended the improvements and added improvements. ② Design and make prototype of "variable suction nozzle diameter system". By a test using a model gas and real gas, evaluated the effect and extended the improvements and added improvements. Finally made prototype of "Automatic suction conditions optimization system" by combining the two systems. Review the effect and reliability of the introducing the system, and the usefulness was examined.
|