Budget Amount *help |
¥5,200,000 (Direct Cost: ¥4,000,000、Indirect Cost: ¥1,200,000)
Fiscal Year 2015: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2014: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2013: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2012: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
|
Outline of Final Research Achievements |
Foundation construction technology of the ancient temple in East Asia are classified into four large, by tracking its lineage, argued that the spread of these technologies is involved in closely with the policy and diplomacy of each region. Although the 5-of-the-century later of the Japanese archipelago tumulus is observed example mound to Tertiary Level of, similar case study of the results of East Asia, mounds Tertiary Level of the 5 century since the late, found in East Asia around issues an end to the Northern Wei phenomenon It was considered to be. From the above points, to go civil engineering technology at the time state-of-the-art, it was concluded that it is beneficial as a consideration that can watch for the political history and diplomatic history of the ancient East Asia.
|