• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

Development of a theoretical shield control method for combined curved alignments in three dimensional space

Research Project

Project/Area Number 24560563
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeMulti-year Fund
Section一般
Research Field Civil engineering materials/Construction/Construction management
Research InstitutionNagaoka University of Technology

Principal Investigator

SUGIMOTO Mitsutaka  長岡技術科学大学, 工学(系)研究科(研究院), 教授 (50196755)

Co-Investigator(Kenkyū-buntansha) TOYOTA Hirofumi  長岡技術科学大学, 工学研究科, 准教授 (90272864)
TAMAI Tatsuki  長岡技術科学大学, 工学研究科, 助教 (30633911)
Project Period (FY) 2012-04-01 – 2015-03-31
Project Status Completed (Fiscal Year 2014)
Budget Amount *help
¥5,460,000 (Direct Cost: ¥4,200,000、Indirect Cost: ¥1,260,000)
Fiscal Year 2014: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2013: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2012: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Keywords地盤工学 / 機械力学・制御 / シミュレーション工学 / シールド工法 / 大深度地下 / 大深度地
Outline of Final Research Achievements

Shield tunnelling method is a standard method to construct a urban tunnel. In the case of shield tunnelling, the proper control of shield behavior is essential to ensure a planned tunnel alignment, since tunnel linings are installed inside of the TBM.
This study aims to develop a theoretical shield control method in three dimensional space and carried out the followings: 1) the development of shield control method for combined curved alignments; 2) the development of shield control method taking account of force equilibrium conditions; and 3) the examination of the newly developed method by site-data and numerical experiments.
The results of this research enable shield control with more realistic in a combined curved alignment in three dimensional space, of which the use is expected to increase near future. This could contribute to improve the accuracy of tunnel construction, to reduce the damage of segments during construction, and finally to improve the durability of tunnel.

Report

(4 results)
  • 2014 Annual Research Report   Final Research Report ( PDF )
  • 2013 Research-status Report
  • 2012 Research-status Report
  • Research Products

    (4 results)

All 2015

All Journal Article (2 results) (of which Peer Reviewed: 2 results,  Acknowledgement Compliant: 2 results) Presentation (2 results)

  • [Journal Article] Study on steering method of H&V shield to construct a spiral tunnel2015

    • Author(s)
      T.N. Huyn, J. Chen, M. Sugimoto
    • Journal Title

      Proc. of World Tunnel Congress 2015

      Volume: 1 Pages: 1-10

    • Related Report
      2014 Annual Research Report
    • Peer Reviewed / Acknowledgement Compliant
  • [Journal Article] Analysis on shield operational parameters to steer articulated shield2015

    • Author(s)
      T.N. Huynh, J. Chen, M. Sugimoto
    • Journal Title

      Proc. of 15ARC

      Volume: 1 Pages: 1-4

    • Related Report
      2014 Annual Research Report
    • Peer Reviewed / Acknowledgement Compliant
  • [Presentation] Analysis on shield operational parameters to steer articulated shield2015

    • Author(s)
      T.N. Huyn
    • Organizer
      International Society of Soil Mechanics and Geotechnical Engineering
    • Place of Presentation
      Fukuoka, Japan
    • Year and Date
      2015-11-09 – 2015-11-13
    • Related Report
      2014 Annual Research Report
  • [Presentation] Study on steering method of H&V shield to construct a spiral tunnel2015

    • Author(s)
      T.N. Huyn
    • Organizer
      International Tunnel Association
    • Place of Presentation
      Dubrovnik, Croatia
    • Year and Date
      2015-05-25 – 2015-05-27
    • Related Report
      2014 Annual Research Report

URL: 

Published: 2013-05-31   Modified: 2019-07-29  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi