Budget Amount *help |
¥5,460,000 (Direct Cost: ¥4,200,000、Indirect Cost: ¥1,260,000)
Fiscal Year 2014: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2013: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2012: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
|
Outline of Final Research Achievements |
During a period before reaching it at the present after modern times, I elucidated the great disaster happened in the various places throughout the all over Japan and the relations of the elementary school school building from the viewpoint of disaster revival. With the spread of earthquake-resistant fireproof steel reinforced concrete structure, generalization of the setting of the lecture hall as the refuge space and the gymnasium became clear. On the other hand, the revival was the opportunity of integration and abolition and therefore reorganization of the area community produced it and inspected that the relations with the area changed. I carried out a complete survey before the dismantling of the damaged elementary school at the stricken area of the Great East Japan Earthquake and grasped the present situation before the damage and performed the comparison with the revival school building.
|