Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2014: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2013: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2012: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Outline of Final Research Achievements |
The objective of this research project is to develop a support system of hydraulic structures for irrigation and drainage based on data assimilation. We achieved the following three tasks:1) We developed an algorithm of data assimilation which can be applied to geotechnical problems and verified its applicability, 2) We proposed a new ecofrienfly Life Cycle Cost criteria and studied its usefulness through numerical experiments, 3) We confirmed that model tests for construction process of structures can be designed.
|