Project/Area Number |
24860067
|
Research Category |
Grant-in-Aid for Research Activity Start-up
|
Allocation Type | Single-year Grants |
Research Field |
Metal making engineering
|
Research Institution | Fukuoka Institute of Technology |
Principal Investigator |
KUBO Hironari 福岡工業大学, 工学部, 准教授 (90604918)
|
Project Period (FY) |
2012-08-31 – 2014-03-31
|
Project Status |
Completed (Fiscal Year 2013)
|
Budget Amount *help |
¥2,990,000 (Direct Cost: ¥2,300,000、Indirect Cost: ¥690,000)
Fiscal Year 2013: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2012: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
|
Keywords | スラグ / リン / 比重分離 / 資源化 / 鉄鋼製錬 |
Research Abstract |
The purpose of this study is to reduce the amount of steelmaking slag, especially dephosphorization slag, and to recover valuable phosphorus from the slag. When discharged, the dephosphorization slag exists as phosphorous-enriched solid phases together with matrix liquid phases containing FeO. Because of these characteristics, centrifugation experiments of molten dephosphorization slag were carried out using a centrifugal separator combined with an electric furnace. Consequently, most of the phosphorous-enriched solid phases accumulated in the upper layer of the obtained low-basicity slag.
|