Budget Amount *help |
¥15,860,000 (Direct Cost: ¥12,200,000、Indirect Cost: ¥3,660,000)
Fiscal Year 2015: ¥3,380,000 (Direct Cost: ¥2,600,000、Indirect Cost: ¥780,000)
Fiscal Year 2014: ¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2013: ¥8,190,000 (Direct Cost: ¥6,300,000、Indirect Cost: ¥1,890,000)
|
Outline of Final Research Achievements |
Generally, a large amount of sludge is generated in the disaster sites, and usually this sludge becomes an obstacle for prompt restoration. In this study, a continuous sludge recycling system was proposed to contribute the prompt restoration of disaster sites. This system can recycle the sludge in the disaster sites and produce the high quality ground materials. In this study, several elements technologies of the system were investigated and then a machine model of continuous sludge improvement was made. By using this model, the usefulness of proposed system in this study was experimentally investigated.
|