Budget Amount *help |
¥5,200,000 (Direct Cost: ¥4,000,000、Indirect Cost: ¥1,200,000)
Fiscal Year 2015: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
Fiscal Year 2014: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2013: ¥2,860,000 (Direct Cost: ¥2,200,000、Indirect Cost: ¥660,000)
|
Outline of Final Research Achievements |
In this research, we have studied the operational availability of beam control system based on the big data analysis especially for the large scale accelerator. The application software by using EPICS framework has been developed for aiming at the continuous acquisition of large number of accelerator parameters. In addition, the beam orbit data from 100 beam position monitors can be synchronously obtained. We obtained the information about the feasibility of effective beam operation using the beam jitter analysis based on the big data analysis framework.
|