Budget Amount *help |
¥5,070,000 (Direct Cost: ¥3,900,000、Indirect Cost: ¥1,170,000)
Fiscal Year 2015: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2014: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2013: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
|
Outline of Final Research Achievements |
As basic study to establish construction design of the fresh concrete, we developed flow analytical technique of fresh concrete in this study. Analysis in consideration of temperature dependence and materials segregation of the concrete is available for this flow analytical technique. Furthermore, We used BIM (Building Information Modeling) as an efficient input data system of the flow analysis. The use of BIM did flow analysis of the fresh concrete effectively.
|