Budget Amount *help |
¥24,700,000 (Direct Cost: ¥19,000,000、Indirect Cost: ¥5,700,000)
Fiscal Year 2016: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2015: ¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2014: ¥5,980,000 (Direct Cost: ¥4,600,000、Indirect Cost: ¥1,380,000)
Fiscal Year 2013: ¥12,610,000 (Direct Cost: ¥9,700,000、Indirect Cost: ¥2,910,000)
|
Outline of Final Research Achievements |
Toward the formation of electron-positron plasmas in a laboratory, experiments with intense slow positron beam were conducted in a dipole magnetic configuration. In a prototype dipole experiment with a permanent magnet, operated at the NEPOMUC positron facility, 100% lossless injection into closed magnetic surfaces, trapping for more than 1 s, and orbit manipulation were demonstrated for 5 eV positron beam. Based on these experimental results, development of a levitated dipole experiment was conducted, including the levitation system, efficient direct cooling of a high temperature superconducting (HTS) coil winding, fabrication of HTS coils to be used for the confinement of plasmas.
|