Budget Amount *help |
¥24,440,000 (Direct Cost: ¥18,800,000、Indirect Cost: ¥5,640,000)
Fiscal Year 2016: ¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2015: ¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
Fiscal Year 2014: ¥10,140,000 (Direct Cost: ¥7,800,000、Indirect Cost: ¥2,340,000)
Fiscal Year 2013: ¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
|
Outline of Final Research Achievements |
This research was carried out to develop a method to lead appropriate default values to implement a building performance modeling at an early stage of building design. The definition of the default values was discussed first. Then, the method to create the values was proposed. Some case studies were conducted to check the validity in the real building design. Additionally, databases of variable default values for sustainable building designs, e.g. window to wall ration for daylighting design and target air change rate for natural ventilation design, were created.
|