Budget Amount *help |
¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2015: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2014: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2013: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
|
Outline of Final Research Achievements |
The purpose of this study is to consider the design of a system to integrate the environmental information on environmental impact assessment and evaluation system for public works. As a result, some of Japanese prefectural governments have already introduced the evaluation system, and environmental information is included in the system. But on the system operation, it is in a small number of cases that the description of environmental information in the evaluation document is read about EIA information. As the officers share environmental information through the document preparation, to make a stipulation of internal effort would be able to ensure to utilize environmental information between 2 systems.
|