Budget Amount *help |
¥4,030,000 (Direct Cost: ¥3,100,000、Indirect Cost: ¥930,000)
Fiscal Year 2016: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2015: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2014: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2013: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Outline of Final Research Achievements |
Traditional control charts are designed for processes where large historical data sets are available before a production run for estimating process parameters and computing control limits. Many processes, particularly in semiconductor manufacturing, often involve limited data sets, which result from high-mix low-volume production. Therefore, we proposed a control chart based on bayesian statistics, an application of multivariate control charts, and a selection guide for two-level supersaturated designs.
|