Budget Amount *help |
¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2015: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2014: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2013: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
|
Outline of Final Research Achievements |
In this study, we conducted snowmelt experiments, and we clarified occurrence and transport of snowmelt water in the snow. Moreover, we conducted a survey of roof snow on an actual building with a pitched roof, and we obtained basic data necessary for developing a numerical model. Considering water transport in the snow, we developed a numerical model that can predict roof snow on a pitched roof, and we clarified the validity of it.
|