Budget Amount *help |
¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2027: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2026: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2025: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
|
Outline of Research at the Start |
We aim to design a novel traffic network, which will be introduced in the real-life traffic flow system for a time-cost-minimizing emergency evacuation, that issues recommendations through IoT devices for adapting to the social dilemma that originated during evacuation hours. However, no previous concept other than this proposal has ever shown how IoT devices can be utilized for developing a traffic network for a time-saving evacuation. The proposed IoT-DBT networking system is dedicated to advanced computational science and AI technology.
|