Budget Amount *help |
¥15,990,000 (Direct Cost: ¥12,300,000、Indirect Cost: ¥3,690,000)
Fiscal Year 2016: ¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2015: ¥6,110,000 (Direct Cost: ¥4,700,000、Indirect Cost: ¥1,410,000)
Fiscal Year 2014: ¥5,460,000 (Direct Cost: ¥4,200,000、Indirect Cost: ¥1,260,000)
|
Outline of Final Research Achievements |
The purpose of this study is to establish a diagnostic technique to prevent physical deterioration of members and deterioration of habitability more quickly by monitoring moisture movement inside the members, such as wetting and dry/wet repetition, concerning the outer wall of the building. First of all, we constructed a system that captures data by mobile phone by NFC technology utilizing IC tag. Using this measurement system, various experiments were conducted with simulated members assuming actual building materials and actual buildings. As a result, this research enabled us to build the foundation of the wetness monitoring system in the buildings.
|