Budget Amount *help |
¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2016: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2015: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2014: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Outline of Final Research Achievements |
At an event network, an evacuation schelter of disaster and so on, it is needed to develop temporary network. However, it is difficult to build current mesh network technology without specialists. The purpose of this research is to develop a system which build mesh network easily. The important point is that the parameters must be adjusted among layers. Without this, the performance will be very bad. In this research, I have proposed a system which uses the layer 1-3 parameters to establish mesh network.
|