Robust Power System Security in Power Systems
Project/Area Number |
26420236
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Power engineering/Power conversion/Electric machinery
|
Research Institution | Hiroshima University |
Principal Investigator |
Yorino Naoto 広島大学, 工学研究院, 教授 (70182855)
|
Co-Investigator(Kenkyū-buntansha) |
佐々木 豊 広島大学, 工学研究院, 助教 (10511561)
造賀 芳文 広島大学, 工学研究院, 准教授 (40294532)
|
Project Period (FY) |
2014-04-01 – 2017-03-31
|
Project Status |
Completed (Fiscal Year 2016)
|
Budget Amount *help |
¥5,070,000 (Direct Cost: ¥3,900,000、Indirect Cost: ¥1,170,000)
Fiscal Year 2016: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2015: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2014: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Keywords | 電力システム / 供給信頼度 / 太陽光発電 / 不確定性 / ロバスト信頼度 / 需給制御 / レジリエンス / 電力系統 |
Outline of Final Research Achievements |
Due to rapid expansions of renewable energy (RE) generations, it becomes more important to assess the feasibility of power system operation under limited controllable resources.This research proposes a method to evaluate the size of the feasible region of power system operation in control space for the examination of the effective system reserve margin under uncertainties.
|
Report
(4 results)
Research Products
(34 results)