Outline of Final Research Achievements |
To intend to put both the skeleton and the infill of emergency temporary housing on circulation of reuse by dissolution and rebuilding, investigation analysis and solution proposal were done for development of a system for design and production. AS for the infill, general-purpose and stackable furniture unit system by modular coordination was developed and adopted to the prototype design for some temporary housing. As for the skeleton, a experimental project of dissolution and rebuilding of temporary housing using ITAKURA wooden construction method was investigated and estimated for its possibility of reuse.
|