Budget Amount *help |
¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2016: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2015: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2014: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Outline of Final Research Achievements |
The dense seismic observation system for generic use was studied. The sensor of which this system composed must be small, right, and cheap. Something suitable was chosen by the condition from the various sensors, and we try to observe then at the same time for comparison. This sensor is decided to place in an electric power outlet and fix. Data transmission by radio communication was examined for huge data collection.
|