Budget Amount *help |
¥3,640,000 (Direct Cost: ¥2,800,000、Indirect Cost: ¥840,000)
Fiscal Year 2016: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2015: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2014: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Outline of Final Research Achievements |
The following four techniques have been studied: 1) a visibility estimation method considering the relationship among multiple target objects in traffic scenes, 2) a visibility estimation method in rainy driving scenes where raindrops are on the front glass of a vehicle, 3) a visibility estimation method based on the 3D-structure of the traffic scene, 4) a visibility estimation method for adaptively switching the estimators based on the characteristics of vehicle drivers.
|