Budget Amount *help |
¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
Fiscal Year 2015: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2014: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Outline of Final Research Achievements |
The pain is the warning signal which tells danger for a living body, and I have the important role. A relation between a pain and a stress is watched in recent years. But there are a lot of unclear points for participation of a sexual cycle. So vagina sumea of a female rat was extracted, a sexual cycle was specified by Giemsa stain and an experiment was made. For 6 hours, a day a wire netting restriction stress was performed as a continuous stress load. After noxial stimulus used a pinch stimulus and analyzed a reply of the beltlike time of the time of noxial stimulus, it increased in a reply of excitability in estrus.
|