Project/Area Number |
59460160
|
Research Category |
Grant-in-Aid for General Scientific Research (B)
|
Allocation Type | Single-year Grants |
Research Field |
建築計画・都市計画
|
Research Institution | Shibaur Institute of Technology |
Principal Investigator |
FUJIKAMI Teruyuki Shibaura Inst.of Tech., Professor, 工学部, 助教授 (70087279)
|
Co-Investigator(Kenkyū-buntansha) |
菊岡 倶也 芝浦工業大学, 工学部・建築工学科, 非常勤講師
NAKAZAWA Harushige Dep.of Tech.,Hosei Univercity, Instructor, 工学部・建築学科, 講師 (30120827)
KIKUOKA Tomoya Shibaura Inst.of Tech., Instructor (part-time)
|
Project Period (FY) |
1984 – 1986
|
Project Status |
Completed (Fiscal Year 1986)
|
Budget Amount *help |
¥5,700,000 (Direct Cost: ¥5,700,000)
Fiscal Year 1986: ¥1,500,000 (Direct Cost: ¥1,500,000)
Fiscal Year 1985: ¥2,500,000 (Direct Cost: ¥2,500,000)
Fiscal Year 1984: ¥1,700,000 (Direct Cost: ¥1,700,000)
|
Keywords | Wooden-house / Repair / Reform / Durable-years / Life-cycle-cost (LCC) / Approximate-estimate-method / Dilapidation / 増改築需要 |
Research Abstract |
Generally speaking, There is no established systematic method of repairing wooden houses which have been built about 30 millions all over the country, because of lack in practical data. In this study, a vast amount of house-repairing data has been collected and examined from four point of view ; analyzing contract documents of practical repair works, Surveying repair career in wooden houses, surveying reform-builders and Using statistical data. Utilizing those data-base, following result or out put obtained. 1) Indication of the caracteristics in repair cost expenditure, and computation of amount of reforming works in demand. 2) Presumption for regional durable-years of houses by prefectures 3) Establishment of an approximate estimate method of repair expenses in wooden houses. 4) Proppsal on systimatic method of long-range repair expenditure planning in reinforced-concrete buildings. 5) Analysis on the present state of reform-builders. Some problems which have been remained are as follow. 1) Some improvement of above-mentioned method estimating repair expanses in wooden houses 2) Analysis of practical reform-works exanples and establishment of repair cost index.
|