Comparative Study on Construction Project Management

Research Project

Project/Area Number 63450089
Research Category

Grant-in-Aid for General Scientific Research (B)

Allocation TypeSingle-year Grants
Research Field 建築計画・都市計画
Research InstitutionKYOTO UNIVERSITY

Principal Investigator

FURUSAKA Shuzo  Kyoto University, Faculty of Engineering : Associate Professor, 工学部, 助教授 (60109030)

Co-Investigator(Kenkyū-buntansha) ENDO Kazuyoshi  Kyoto University, Faculty of Engineering : Instructor, 工学部, 助手 (20194029)
FURUKAWA Osamu  Kogakuin University, Faculty of Engineering : Professor, 工学部, 教授 (70026350)
Project Period (FY) 1988 – 1989
Project Status Completed (Fiscal Year 1989)
Budget Amount *help
¥2,600,000 (Direct Cost: ¥2,600,000)
Fiscal Year 1989: ¥1,000,000 (Direct Cost: ¥1,000,000)
Fiscal Year 1988: ¥1,600,000 (Direct Cost: ¥1,600,000)
KeywordsProject management / Building construction organization / Design & construction / Construction management / International comparison / Management / control activities / Construction industry / Sub-package / マネジメント / 確実性 / 調整業務 / コンストラクションマネジャ- / 契約方式 / プロジェクト組織 / 組織 / 管理方式 / サブコントラクター / プロジェクトチーム / ゼネラルコントラクター
Research Abstract

There are differences in the concept and approach to project management.
The differences can be summarized into differences in parties involved in project management and relationship between involved parties.
(1)There are four kinds of project organization in practice. Those are general contractor oriented organization (GC type), architect/engineer oriented organization (A/E type), client oriented organization (C type) and construction manager oriented organization (CM type).
(2)We can usually find GC type in Japan, A/E type in the U.S.A. and C type in Singapore. CM type has recently been becoming more popular in the world except in Japan.
(3)We explain the differences between such organizations by giving quality assurance activities for structure work. The client involvement-represents more than 10% of quality assurance activities in C type, while there is very little client involvement in A/E type, and there is no client involvement in GC type. For such amount of activities, it naturally requires more personnel from the client and thus results in a more complicated organization for C type.
(4)The subcontractor involvement represents 70-90% of the total quality assurance activities in A/E type project. While in GC type project, the subcontractor involvement depended on the work and there is very little subcontractor involvement in C type project.
(5)The general contractor involvement in GC type project depends on the work; more than 50% for reinforcing bar work and steel structural work, and 30-40% for framework and concrete work. Then in either C type project or A/E project there is very limited general contractor involvement, only 10-20% is evidenced.
(6)These results can be used not only in seeking a more appropriate approach for Japanese contractors in their future involvement in foreign countries, but in developing a different concept in project management approach in foreign countries.

Report

(3 results)
  • 1989 Annual Research Report   Final Research Report Summary
  • 1988 Annual Research Report
  • Research Products

    (6 results)

All Other

All Publications (6 results)

  • [Publications] 古阪秀三: "建築プロジェクトマネジメント方式の国際比較(1)" 第5回建築生産と管理技術シンポジウム. 89-94 (1989)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1989 Final Research Report Summary
  • [Publications] 古阪秀三: "建築プロジェクトマネジメント方式の国際比較(2)" 第6回建築生産と管理技術シンポジウム(7月刊行予定). (1990)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1989 Final Research Report Summary
  • [Publications] S.Furusaka, O.Furukawa, K.Endo: "Comparative Study on Project Management (1)" 5th Symposium on Organization and Management of Building Construction 89-94 1989.

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1989 Final Research Report Summary
  • [Publications] S.Furusaka, O.Furukawa, K.Endo: "Comparative Study on Project Management (2)" 6th Symposium on Organization and Management of Building Construction The publication is scheduled in July 19.

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1989 Final Research Report Summary
  • [Publications] 古阪秀三: "建築プロジェクトマネジメント方式の国際比較(2)" 第6回「建築生産と管理技術」シンポジウム. (1990)

    • Related Report
      1989 Annual Research Report
  • [Publications] 古阪秀三: 第5回「建築生産と管理技術」シンポジウム論文集. (1989)

    • Related Report
      1988 Annual Research Report

URL: 

Published: 1988-04-01   Modified: 2016-04-21  