• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

1993 Fiscal Year Final Research Report Summary

A STUDY ON CONSTRUCTION MANAGEMENT IN A BUILDING PROJECT

Research Project

Project/Area Number 04650567
Research Category

Grant-in-Aid for General Scientific Research (C)

Allocation TypeSingle-year Grants
Research Field 建築計画・都市計画
Research InstitutionWASEDA UNIVERSITY

Principal Investigator

KANO Naruo  WASEDA UNIVERSITY, DEPARTMENT OF ARCHITECTURE, PROFESSOR, 理工学部, 教授 (60112992)

Project Period (FY) 1992 – 1993
KeywordsCONSTRUCTION MANAGEMENT / CONSTRUCTION INDUSTRY / BUILDING PROJECT / MANAGEMENT IN CONSTRUCTION / CONTRACTOR / CLIENT
Research Abstract

The word "CM (Construction Management)" has been used frequently these days. CM is an inevitable subject for rebolution in construction industry.
However, this form of contract which is prevalent in Western countries has many unfavorable aspects for Japanese construction industry. Taking into consideration the nature of Japanese construction industry, its culture, and its custom, it is a little too hasty to conclude that the Western-style CM will become the mainstream in the form of contract in Japanese construction industry. It is more important ot think about Japanese-style Cm method which is suited Japanese construction industry.
In this research, the survey was conducted on CM method in construction project anonymously. Two thousand major companies in Japan were chosen clarify clients' needs and options on the following items : (1) An outline of the company ; (2) A division in charge of construction project ; (3) the recent situation of construction work ; (4) Requests to design firms and construction companies ; and, (5) Opinions on the new form of construction contract.
Looking at the answers obtained from about 400 companies, it is clear that clients are strongly interested in CM method and many of them are likely to conseder whether to adopt CM method in the future. These answers also suggest that all employers are not completely satisfied with design firm and construction companies ; there is much room for improvement. In addition, hearings from construction companies and consultants as well as the present CM situation in the U.S.were analyzed to clarify the possibility for responding clients' needs and the opinions on Japanese-style CM method.

  • Research Products

    (4 results)

All Other

All Publications (4 results)

  • [Publications] 嘉納成男: "発注者のCM方式に対する意識" 日本建築学会大会学術講概集. 897-898 (1992)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 嘉納成男: "建設会社に対する意識調査の結果" 日本建築学会大会学術講概集. 783-784 (1993)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] NARUO KANO: "CONSTRUCTION MANAGEMENT IN A BUILDING PROJECT, (PART1) A SURVEY ON THE OPINION CLIENTS TO CONSTRUCTION MANAGEMENT" JLA, PROC.OF ANNUAL CONVENTION. 897-898 (1992)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] NARUO KANO: "CONSTRUCTION MANAGEMENT IN A BUILDING PROJECT, (PART2) A SURVEY ON THE OPINION CLIENTS TO CONTRACTORS" JLA, PROC.OF ANNUAL CONVENTION. 783-784 (1993)

    • Description
      「研究成果報告書概要(欧文)」より

URL: 

Published: 1995-03-27  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi