• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

1998 Fiscal Year Final Research Report Summary

Development and Evaluation of Dispatching Schemes Suitable for Automated Manufaciuning

Research Project

Project/Area Number 08680469
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field 社会システム工学
Research InstitutionWaseda University

Principal Investigator

MORITO Susumu  Waseda Univ., School of Science4 Engnnring, Professor, 理工学部, 教授 (50134193)

Project Period (FY) 1996 – 1998
KeywordsDispatching Rule / Optimizationn of Dispatching Priority / Simulation / Overlapping Production / Meta - Heuristics / FMS / Lead Time Estination / Job Shop Scheduling
Research Abstract

Optimization of dispatching schemes suitable for modern automated production systems has been studied, and new dispatching rules as well as enumerative algorithms to explore "optimal" dispatching priority have been developed and evaluated through extensive computational experiments. A survey of scheduling practices indicated that dispatching is "the" way of scheduling in a vast majority of real shops, indicating that the type of scheduling in which starting time and/or order of individual operations of jobs is given (as in the so-called job shop scheduling problem) is not practical, and thus optimization of dispatching is focused upon with the help of such tools as simulation and modern heuristics.
Main outcomes of this research include : (l) development and evaluation of processing-time-based dispatching rules suitable for automated manufacturing systems in which multiple identical jobs flow, (2) development and evaluation of simulation-based enumeration algorithm for finding optimal dispatching priority, (3) lead time estimation in a job shop with multiple identical jobs and its applications to slack-based dispatching rule, (4) introduction of optimization in dispatching and development of the "cooperative dispatching" scheme, (5) production planning of two-stage parallel-machine flow shop

  • Research Products

    (12 results)

All Other

All Publications (12 results)

  • [Publications] 李根亨,森戸晋: "FMSの投入優先順序決定のためのシミュレーション/準最適化アプローチ"日本経営工学会論文誌. 48・1. 53-61 (1997)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] Susumu Morito,Keun Hyng Lee: "Efficient Simulation/Optimization of Dispatching Priority with "Fake" Processing Time"Processing of the 1997 Winter Simulation Conference. 872-879 (1997)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 森戸晋,久保幹雄: "数理計画とシミュレーション"オペレーションズ・リサーチ. 43・2. 81-87 (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 今泉淳,山越康裕,村上元一,森戸晋: "ジョブの分岐を伴う2工程並列機械フローショップスケジューリングへの分割アプローチ"オペレーションズ・リサーチ. 43・11. 624-631 (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] Rolf Seifert, Susumu Morito: "Cooperative Dispatching-Exploitine the Flexibility of FMS by Means of Incremental Optimization"European Journal of Operational Research. (to appear).

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 森戸晋,相澤りえ子,貝原俊也: "Visual SLAMによるシステムシミュレーション"共立出版. (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] Keun Hung Lee and Susumo Morito: "A Combined Simulation/Approximate Optimization Approach for Finding a Near-Optimal Dispatching Priority in an FMS"Journal of Japan Industrial Management Association. Vol. 48, No. 1(in japanese). 53-61 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Susumu Morito and Keun Hyung Lee: "Efficient Simulation/Optimization of Dispatching Priority with 'Fake' Processing Time"Proceedings of the 1997 Winter Simulation Conference. 872-879 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Jun Imaizuni, Yasuhiro Yamakoshi, Motokazu Murakami and Susumu Morito: "Production Planning of Two-Stage Parallel-Machine Flow Shop : Batching and Sequencing"Communication of the Operations Research Society of Japan. Vol. 43, No. 11 (in japanese). 624-631 (1998)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Ralf Seifert and Susumu Morito: "Cooperative Dispatching -- Exploiting the Flexibility of an FMS by Means of Incremental Optimization"European Journalof Operational Research. (to appear).

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Shunsuke Hayashi and Susumu Morito: "Lead Time Estimation in a Job Shop with Multiple Identical Jobs and Its Applications to Slack-Based Dispatching Rule"Proceedings of the 1998 Spring National Conference of JIMA. (in japan). (1997)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Susumu Morito and Keun Hyung Lee: "Dispatching in Automated Manufacturing"A Survey. (in japan). (1999)

    • Description
      「研究成果報告書概要(欧文)」より

URL: 

Published: 2001-10-23  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi