• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

1999 Fiscal Year Final Research Report Summary

Developing a International Cooperative Production and Supply System

Research Project

Project/Area Number 09680425
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field 社会システム工学
Research InstitutionHiroshima University

Principal Investigator

HIRAKI Shusaku  HIROSHIMA UNIVERSITY, FACULTY OF ECONOMICS, PROFESSOR, 経済学部, 教授 (10034373)

Project Period (FY) 1997 – 1999
Keywordsautomobile repair parts / production ordering system / inventory control / logistics / supply chain management / Toyota production system / pull-type ordering system / global complementary production system
Research Abstract

In automobile manufactures, many kinds of final products have to be produced in order to respond to customers' needs and these needs frequently bring out new models. More than ten thousand parts and materials are required to assemble one unit of a final product and each product is usually used for about ten years. Hundreds of thousands of repair parts are required to assure the maintenance of products after they are sold all over the world. Hence, it is very important to develop an efficient production and supply system for automobile repair parts which satisfies users' needs with low inventory level. This research aims to develop a international cooperative production and supply system for automobile repair parts and gets the following research results.
(1) We analyzed the characteristics of time series demand structure of automobile repair parts and proposed a way for classifying them into three categories under the consideration of not only the demand for them but. also the frequency … More of order.
(2) We formulated a production ordering system in the form of a mathematical model based on the concept of the pull-type ordering system and analyzed the effects of transportation lead time on the variation of production and transportation ordering quantities and inventory quantity for the purpose of designing of an economic buffer stock level at each stock point.
(3) We proposed a way for managing supply chain process of automobile repair parts based on the concept of the Toyota production system which is realized by managing the repair parts with actual performance data.
(4) We proposed some typical production and transportation models in the international cooperative global complementary Production system (ICGCPS) and clarified the characteristics of them with respect to the sets of path and transportation. We made a comparative analysis of transportation models with respect to the average loading rate.
(5) We formulate a new production and transportation ordering model based on the concept of pull type ordering system under considering transshipment and mixed loading and analyze the variations of ordering, withdrawal and inventory quantities of the ordering model. Less

  • Research Products

    (20 results)

All Other

All Publications (20 results)

  • [Publications] 平木秀作: "Analysis of the Production and Transportation Models for Three Production Bases in ICGCPS"Proceedings of the 4th International Conference on Computer Integrated Manufacturing. Vol.1. 601-610 (1997)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "A study on Production and Transportation Model Design in Global Compliementary Production systems"Proceedings of the 14th International Conference on Production Research. Vol.1. 316-319 (1997)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "Analysis of a Global Production and Supply System for the Automobile Repair Parts under Stochastic Transportation Lead-Time"Proceedings of 1998 Annual Meeting of Asia Pacific Decision Science Institute. 505-512 (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "Designing of a Global Production and Supply Ststem for the Autmobile Repair Parts"Proceedings of 1998 Pacific Conference on Manufacturing. 7-12 (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "Production-distribution Planning for the International Co-operative Global Complementary Production Systems"Proceedings of the 4th China/Japan International Symposium on Industrial Management. 245-250 (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "A New Approach to managing Supply Chain Process of Automobile Repair Parts"Proceeding of the International Symposium on Manufacturing Strategy. 93-98 (1998)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "自動車補修部品のサプライチェーンマネジメント"広島大学経済論叢. 22-2/3. 1-23 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "Designing of a production ordering system for the automobile repair parts"International Journal of Production Economics. 60-61. 289-294 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "Analysis of Production and Transportation Models in the Generalized ICGCPS"Proceedings of the 12th Int.Conf.on ISPIM. 119-124 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 平木秀作: "Designing of Pool Type Ordering System in the ICGCP under Comsidering Transshipment and Miced-Loading"Proceedings of the 2nd Asia-Pacific Conference on Industrial Engineering and.Management Systems. 369-372 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] Su, Y. and Hiraki. S.: "Analysis of the Production and Transportation Models for Three Production Bases in ICGCPS"A. Sen, A. I. Sivakumar & R., Gay (eds.), Computer Integrated Manufacturing. Vol. 1, Springer. 601-610 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Su. Y. and Hiraki, S.: "A Study on Production and Transportation Model Design in Global Complementary Production"Proc. of the 14th Int. Conf. on Production Research. 316-319 (1997)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S., Ishii, K. and Katayama, H.: "Analysis of a Global Production and Supply System for the Automobile Repair- Parts under Stochastic Transportation Lead Time"Proc. of the 1998 Annual Meeting of Asia Pacific Decision Sciences Institute. 505-512 (1998)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S., Ishii. K. and Katayama, H.: "Designing of a Global Production and Supply System for the Automobile Repair Parts."Proc. of the Pacific Conf. on Manufacturing. 7-12 (1998)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S., Ishii, K. and Katayama, H.: "Production/Distribution Planning for the International Co-operative Global Complementary Production Systems."Proc. of the 4ht China/Japan Int. Symposium on Industrial Management. 245-250 (1998)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S.: "A New Approach to Managing Supply Chain Process of Automobile Repair Parts"Proc. of the Int. Symposium on Manufacturing Strategy. 93-98 (1998)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S.: "Supply Chain Management for Automobile Repair Parts"The Hiroshima Economic Review. Vol. 22, No. 2・3 (in Japanese). 1-23 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S., Ishii, K. and Katayama, H.: "Designing of a production ordering system for the automobile repair parts"Int. Journal of Production Economics. Vols. 60-61. 289-294 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S., and Su, Y.: "Analysis of Production and Transportation Models in the Generalized ICGCPS"Proc. of the 12th Int. Conf. on ISPIM. 119-124 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hiraki, S., Ichimura, T., Katayama, H. and Ishii, K.: "Designing of a Pull Type Ordering System in the ICGCPS under Considering Transshipment and Mixed-Loading"Proc. of the 2nd Asia-Pacific Conf. on Industrial Engineering and Management Systems. 369-372 (1999)

    • Description
      「研究成果報告書概要(欧文)」より

URL: 

Published: 2001-10-23  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi