• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

1999 Fiscal Year Final Research Report Summary

A Study on Evaluation of Flexibility in Production System

Research Project

Project/Area Number 09680430
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field 社会システム工学
Research InstitutionTokyo Metropolitan Inst. Of Tech.

Principal Investigator

TSUBONE Hitoshi  Dept. of Production & Information System, Professor, 工学部・生産情報システム工学科, 教授 (50163879)

Project Period (FY) 1997 – 1999
KeywordsFlexibility / Flow time / Job shop / Machine breakdown / Routing / Machine / Rush order / Scheduling
Research Abstract

This paper evaluate two types of flexibility, machine flexibility and routing flexibility, in terms of manufacturing performance in various shop environments: 1) Materials flow vary from job shop to flow shop, 2) Bottleneck occurs in the production process, 3) Machine breakdown occurs, and 4) Rush order inters in the shop. The experiments results which flexibility type is superior under such conditions. The average flow time is adopted as the measure of manufacturing performance.

  • Research Products

    (13 results)

All Other

All Publications (13 results)

  • [Publications] 坪根 斉: "Acomparisom between bosicayclic scheuling and irregular cyclie scheduling in a two-stoge hybrid floug shop"DECISION SCIENCES Journal. vol. 31・No. 1. (2000)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 坪根 斉: "共通化の階層的評価に関する研究-生産システムの柔軟性に関する研究-"日本経営工学会誌. Vol. 50. No. 3. 121-130 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 坪根 斉: "The impact of order release strategies on the manufacturing performance for shop floor control"PRODUCTION PLANNING & CONTKOL. Vol. 10. No. 1. 58-66 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 坪根 斉: "A Comporison Between Machine Flexibility and Routing Flexibility"International Journal of Manufacturing Systems. Vol. 11. No. 1. 83-102 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 坪根 斉: "Impact of vorious flexibility in a hybrid fobrication/assembly"International Journal of Production Economics. Vol. 60/61. 117-124 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 坪根 斉: "Decision Support System for Production Scheduling-Camcept and Application"ENCYCLEOPEDIA OF MICROCOPUTERS. Vol. 22. 57-72 (1999)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] 坪根 斉: "改訂 生産管理システム入門"株式会社工学図書. 195 (2000)

    • Description
      「研究成果報告書概要(和文)」より
  • [Publications] Hitoshi TSUBONE: "A Comparison between basic scheduling and irregular cyclic scheduling in a two-stage hybrid flow shop"DECISION SCIENCES Journal. Vol. 31, No. 1. (2000)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hitoshi TSUBONE: "A Study on Hierarchical Evaluation on Commonality"Journal of Industrial Management. Vol. 50, No. 3. 121-130 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hitoshi TSUBONE: "The impact of order release strategies on the manufacturing performance for shop floor control"PRODUCTION PLANNING & CONTROL. Vol. 10 N). 1. 58-66 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hitoshi TSUBONE: "A Comparison between Machine Flexibility and Routing Flexibility"International Journal of Flexible Manufacturing Systems. Vol. 11, No.1. 83-102 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hitoshi TSUBONE: "Impact of various flexibility in a hybrid fabrication/assembly productionsystem"International Journal of Production Research. Vol. 60/61. 117-124 (1999)

    • Description
      「研究成果報告書概要(欧文)」より
  • [Publications] Hitoshi TSUBONE: "Decision Support System for Production Scheduling - Concept and Application -"ENCYCLEPEDIA OF MICROCOMPUTERS. Vol. 22. 57-72 (1999)

    • Description
      「研究成果報告書概要(欧文)」より

URL: 

Published: 2001-10-23  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi