1999 Fiscal Year Final Research Report Summary
Simulation of a software development project for supporting project management
Project/Area Number |
10680406
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
情報システム学(含情報図書館学)
|
Research Institution | Nara Institute of Science and Technology |
Principal Investigator |
MATSUMOTO Kenichi Nara Institute of Science and Technology, Graduate School of Information Science, Associate Professor, 情報科学研究科, 助教授 (70219492)
|
Project Period (FY) |
1998 – 1999
|
Keywords | Software Process / Project management / Learning effect / Cost estimation / Virtual project |
Research Abstract |
As a result of the research over for two years, the simulation system, which can carry out false experience of various software development projects, was built, and it clarified that the project management support by the simulation was possible. Three basic models (the amount model of work, a productivity model, knowledge model), which constitute the work progress model, which is to the foundations of a simulation especially, were evaluated, it was based on the result, and the simulation system was designed and mounted on Windows. Java was used for mounting of a system. Access and the execution to a system are possible through WWW. Moreover, a system provides the function, which computes the parameter of a basic model from the characteristics (productivity, days required for technical acquisition, etc.) of a project. Thereby, the project administrator without the knowledge about a basic model can also use a system now comparatively easily. I set up the virtual project (virtual project) with the feature typical as a software development project, and had the subjective estimate and the estimate using the system performed to each six skillful administrators. Consequently, in the estimate of a development term, the thing, which used subjective, estimate value and a subjective system and which it estimates and no difference is between values was confirmed at 5% of significant levels. Furthermore, the difference in the knowledge which a developer has was expressed in detail, and by expressing the knowledge structure required of work enforcement on a cognitive map showed that it could be reflected in progress.
|
Research Products
(4 results)