2003 Fiscal Year Final Research Report Summary
A design method for optimization of period-related character of integrated business processes
Project/Area Number |
13630132
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Business administration
|
Research Institution | University of Tsukuba |
Principal Investigator |
SATO Ryo University of Tsukuba, Institute of Policy and Planning Sciences, Professor, 社会工学系, 教授 (00178790)
|
Project Period (FY) |
2001 – 2003
|
Keywords | business process / manufacturing-scheduler / business transaction system / UML / planning and scheduling / practical scheduling |
Research Abstract |
The goal of this research is to develop the engineering oriented discipline and design of business processes In this research we have produced an agile scheduler for supply and production process, where uncertainty on both on delivery of raw materials and customer requirements. That is, they may change either amount or due date of suppliers' delivery or customers' orders. The research first used an advanced planning scheduling system, APS, for short, for rescheduling production. Since the scheduler uses the practically detailed data stored in SAP R.3, a widely used enterprise resource planning software, the agile scheduler is most suitable for practical use. The structure of the scheduler is modeled by the class diagram of UML, that is commonly used in software inductry and then the structure is understandable, for practitioners The result of the research also includes the analysis of dynamic behavior of a business process with planning components. It is an augmentation of Little's lemma, and uses routing of business process with available resources. Since the rapid development of information technology enables us new organization of business, the analysis serves as a basis of engineering design of business organization with information systems
|