2018 Fiscal Year Final Research Report
On a theoretical and practical study of scheduling systems for the real world applications
Project/Area Number |
16K01268
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Social systems engineering/Safety system
|
Research Institution | Nanzan University |
Principal Investigator |
Atsuo Suzuki 南山大学, 理工学部, 教授 (70162922)
|
Research Collaborator |
Miura Hidetoshi
|
Project Period (FY) |
2016-04-01 – 2019-03-31
|
Keywords | スケジューリング / シフト作成 / 自動化 / 研修医 / 企業研修 / 時間割作成 |
Outline of Final Research Achievements |
In this project, we study the theoretical modelling and implementation of the system of the various scheduling problems from the stand point of the practical applications. Based on these study, we implemented scheduling systems for hospitals, corporations and a university. For example, for the hospital, we implemented the shift-scheduling system of residents. In this problem, we consider how we realize the priority of the residents scheduling constraints. We utilize the AHP(Analytic Hierarchy Process) to analyse the survey of the residents and found that the priority the scheduler used should be wrong. By this system, they improve the quality of the shift-schedule and save the time to make the schedule.
|
Free Research Field |
オペレーションズ・リサーチ
|
Academic Significance and Societal Importance of the Research Achievements |
病院や企業におけるスケジューリング問題では,おおくの場合,手作業によって問題が解決されている.そのことによって,担当者はおおくの時間の費やして,不完全なスケジュールを作成している.われわれが開発しつつあるスケジューリングのシステムによれば,それらの時間を少なくとも10分の1に短縮できる.例えば,病院の研修医のスケジューリング問題では,3日間かかって1か月のシフトを作成していたのが,確認なども含めて3時間で作成できるようになる.働き方改革の実現が必要になる中で,このように業務を効率化することはその一つの方法として意義のあることである.
|