2022 Fiscal Year Research-status Report
Development of Architectural Preservation Method in Africa: Focusing on Urban Mutual Network
Project/Area Number |
19KK0114
|
Research Institution | Shibaura Institute of Technology |
Principal Investigator |
岡崎 瑠美 芝浦工業大学, 建築学部, 准教授 (90780792)
|
Co-Investigator(Kenkyū-buntansha) |
伊藤 洋子 (渡辺洋子) 追手門学院大学, 上方文化笑学センター, 客員研究員 (40327755)
清水 郁郎 芝浦工業大学, 建築学部, 教授 (70424918)
青島 啓太 追手門学院大学, 基盤教育機構, 准教授 (80714534)
清水 信宏 東京大学, 大学院工学系研究科(工学部), 特別研究員 (60892304)
|
Project Period (FY) |
2019-10-07 – 2024-03-31
|
Keywords | Africa / Ethiopia / Addis Ababa / Armenian Sefer / heritage / urban history / architectural history / conservation |
Outline of Annual Research Achievements |
(1) Research of Armenian Sefer, Addis Ababa: Fieldwork was conducted as a joint work between Shibaura Institute of Technology, School of Architecture and Addis Ababa University, Ethiopian Institute of Architecture, Building Construction and City development (EiABC) (2) Japanese Tea House project in Addis Ababa: Photographic documentation was made before the restoration. (3) Research on Sekota: presentation of the work from the previous fiscal year was made at EiABC.
|
Current Status of Research Progress |
Current Status of Research Progress
2: Research has progressed on the whole more than it was originally planned.
Reason
In the first half of the fiscal year, the research team gathered and organized information on the historic district of Armenian Sefer in Addis Ababa. The team from Tokyo traveled to Addis Ababa in November 2022 and conducted fieldwork with the team in Addis Ababa. A presentation of Sekota was made at Addis Ababa University to share the outcome of the project.
|
Strategy for Future Research Activity |
(1) Workshop in Tokyo: Research collaborators in Addis Ababa will come to Tokyo in July 2023 to discuss the research project. (2) Research on Armenian Sefer: Fieldwork on the Armenian Sefer in November 2023. (3) Promoting networks between Japanese and Ethiopian universities (4) Sharing the output of the research work
|
Causes of Carryover |
2020-2022年度はcovid19の影響により海外渡航が限定されたためその分の費用を次年度使用額とする。2023年度は航空券の燃油価格高騰が見込まれており、前年度の予算を増額分に充てる。
|
Research Products
(4 results)