• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

2022 Fiscal Year Final Research Report

Generation planning and electricity market design considering novel operation and control for future grids

Research Project

  • PDF
Project/Area Number 20K04428
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeMulti-year Fund
Section一般
Review Section Basic Section 21010:Power engineering-related
Research InstitutionMeijo University

Principal Investigator

Masuta Taisuke  名城大学, 理工学部, 教授 (40635794)

Co-Investigator(Kenkyū-buntansha) 山口 順之  東京理科大学, 工学部電気工学科, 准教授 (50371224)
Project Period (FY) 2020-04-01 – 2023-03-31
Keywords電源開発計画 / 電力系統 / 太陽光発電 / 発電機起動停止計画 / 電力市場
Outline of Final Research Achievements

In this study, generation expansion planning evaluation method by long-term supply-demand simulation considering both the spot and balancing markets to verify the sustainability of the electricity markets is proposed and evaluated. The effectiveness of the proposed method is verified through the case study considering several scenarios. In addition, an estimation method of the market price of the generator with the reserve capacity considering both ΔkW and ΔkWh values by generator unit commitment simulation is proposed and evaluated.

Free Research Field

電力系統工学

Academic Significance and Societal Importance of the Research Achievements

電源開発計画シミュレーションでは,一般には経済的に有利とされる石炭機を建設するシナリオよりも,環境性が高いLNG機を建設するシナリオのほうが有利であるという結果が得られた。これは,市場制度の巧拙によって運用費の高い電源の開発も経済的に成立する可能性があることを示している。また,調整力のある電源の電力市場価格の推定では,これまで金額として表すことが難しかったΔkW価値を価格として算出することが可能となっており,今後の市場制度設計における価格設定の方針を決める際に有益な情報となる。

URL: 

Published: 2024-01-30  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi