2010 Fiscal Year Final Research Report
Development of commissioning method for fusion power plant without initial tritium supply
Project/Area Number |
21760703
|
Research Category |
Grant-in-Aid for Young Scientists (B)
|
Allocation Type | Single-year Grants |
Research Field |
Nuclear fusion studies
|
Research Institution | Central Research Institute of Electric Power Industry |
Principal Investigator |
HIWATARI Ryoji Central Research Institute of Electric Power Industry, 原子力技術研究所, 主任研究員 (40371348)
|
Project Period (FY) |
2009 – 2010
|
Keywords | 核融合システム工学 / 初期装荷トリチウム / プラント起動法 |
Research Abstract |
One of the critical issues for DEMO is how to ensure the initial tritium inventory, because of the limited tritium stock in the world market. Hence, in order to ensure the initial tritium inventory for DEMO, some kind of countermeasures is necessary. One of the comprehensive solutions is the commissioning scenario without the initial tritium inventory, in which the tritium produced and bred by the DD fusion reaction assisted by the NBI beam direct reaction are employed for the commissioning of the fusion power plant. This study has revealed that there is a potential of the plasma commissioning scenario without the initial tritium inventory for Demo-CREST.
|