• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

2016 Fiscal Year Final Research Report

Robust Power System Security in Power Systems

Research Project

  • PDF
Project/Area Number 26420236
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeMulti-year Fund
Section一般
Research Field Power engineering/Power conversion/Electric machinery
Research InstitutionHiroshima University

Principal Investigator

Yorino Naoto  広島大学, 工学研究院, 教授 (70182855)

Project Period (FY) 2014-04-01 – 2017-03-31
Keywords電力システム / 供給信頼度 / 太陽光発電 / 不確定性 / ロバスト信頼度 / 需給制御 / レジリエンス
Outline of Final Research Achievements

Due to rapid expansions of renewable energy (RE) generations, it becomes more important to assess the feasibility of power system operation under limited controllable resources.This research proposes a method to evaluate the size of the feasible region of power system operation in control space for the examination of the effective system reserve margin under uncertainties.

Free Research Field

電力システム工学

URL: 

Published: 2018-03-22  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi