2016 Fiscal Year Final Research Report
Study on The Construction Quality Management of Fixactive in The Circumferential of The Pile Using The Electrical Resistivity
Project/Area Number |
26420568
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Building structures/Materials
|
Research Institution | Ritsumeikan University |
Principal Investigator |
|
Research Collaborator |
KOU Motohiro 東海大学, 大学院生
ADACHI Yukio 藤村ヒューム管株式会社, 技術部長
YAMAMOTO Katsuyoshi 清水建設株式会社, 設計長
|
Project Period (FY) |
2014-04-01 – 2017-03-31
|
Keywords | 杭 / プレボーリング工法 / セメントミルク / ソイルセメントミルク / 電気比抵抗 / 一軸圧縮強度 / ブリージング / 養生温度 |
Outline of Final Research Achievements |
Social problems caused by poor quality of the pre-boring embedded pile construction, such as on domestic apartment house also occurred. An adequate consideration for invisible risks inside or below the ground is important in pile foundation construction therefore the demand for advanced. In this research, in order to understand the quality of the construction at early stage, the compressive strength of cement-soil mixture of pile construction after 28 days is estimated using electrical resistivity value of the mixture. More accurate measurement for electrical resistivity value is conducted by inserting the electrodes without using potassium chloride solution as a catalyst. The result showed that there is a certain tendency in the electric resistivity value at the early age regarding to the type of soil mixed in. The most accurate estimation was achieve from the electric resistivity value at the first day and several days onwards, and from the compressive strength after 3 days.
|
Free Research Field |
建築生産・構造
|