• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

Experimental study on the practicality of Borehole Hammer

Research Project

Project/Area Number 03555134
Research Category

Grant-in-Aid for Developmental Scientific Research (B)

Allocation TypeSingle-year Grants
Research Field 資源開発工学
Research InstitutionKYOTO UNIVERSITY

Principal Investigator

KIKUCHI Kohkichi  Kyoto University, Faculuty of Engineering, Professor, 工学部, 教授 (90224899)

Co-Investigator(Kenkyū-buntansha) MITO Yoshitada  Kyoto University, Faculuty of Engineering, Instructor, 工学部, 助手 (40229753)
KUSUDA Hiromu  Kyoto University, Faculuty of Engineering, Instructor, 工学部, 助手 (90169988)
Project Period (FY) 1991 – 1993
Project Status Completed (Fiscal Year 1993)
Budget Amount *help
¥8,900,000 (Direct Cost: ¥8,900,000)
Fiscal Year 1993: ¥800,000 (Direct Cost: ¥800,000)
Fiscal Year 1992: ¥800,000 (Direct Cost: ¥800,000)
Fiscal Year 1991: ¥7,300,000 (Direct Cost: ¥7,300,000)
Keywordsrock test / simple test / striking test / borehole test / in situ test / response value / hammer / deformability / 岩盤力学 / 孔内打撃応答試験 / 原位置岩盤試験 / ボーリング孔 / 打撃応答量 / 変形試験 / 岩盤評価 / 地質工学 / ボ-リング孔
Research Abstract

A test system using "Rock Test Hammer" is often used to evaluate rock mass properties, simply. The Strike Response Value is measured by using this machine, and the modulus of elasticity is expected. So, in order to apply this principle to the borehole investigation, we develop a new machine "Borehole Hammer". With regard to this machine, the laboratry testing using rock specimen was carried out and we have a successful results. However, in situ testing has never been made.
So we made the in-situ testings using "Borehole Hammer" and borehole expansion tests at the several testing yard(igneous rocks, sedimentary rocks and concrete) in order to grasp the applicability of "Borehole Hammer". As the results, the relationship between strike responce value obtained by "Borehole Hammer" and elasticity tends to linear and the accuracy of testing results is clarifed. Futhermore, taking discontinuity density into account, the equation of the estimation for deformability is suggested and more reliable estimation could have been carried out using strike response value.
As the result of in situ testing at the deep borehole, the relationship between testing depth and strike response value is clarified and the applicabilty to the check for the deformation-improvement of rock masses by grouting is also percieved.
As the results of above examinations, the applicability of "Borehole Hammer" to the in-situ rock masses is clarified.

Report

(4 results)
  • 1993 Annual Research Report   Final Research Report Summary
  • 1992 Annual Research Report
  • 1991 Annual Research Report

URL: 

Published: 1991-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi