A Comparative Study of Realizing Conditions and Regional Responses of a Large Scale Water Diversion Project

Research Project

Project/Area Number 05680128
Research Category

Grant-in-Aid for General Scientific Research (C)

Allocation TypeSingle-year Grants
Research Field Human geography
Research InstitutionAichi Gakuin University (1994)
Hyogo University of Teacher Education (1993)

Principal Investigator

SHIRAI Yoshihiko  Aichi-Gakuin University Professor, 教養部, 教授 (80003755)

Co-Investigator(Kenkyū-buntansha) YOSHIMOTO Takafumi  Hyogo University of Teacher Education Associate Professor, 学校教育学部, 助教授 (30167019)
Project Period (FY) 1993 – 1994
Project Status Completed (Fiscal Year 1994)
Budget Amount *help
¥2,000,000 (Direct Cost: ¥2,000,000)
Fiscal Year 1994: ¥800,000 (Direct Cost: ¥800,000)
Fiscal Year 1993: ¥1,200,000 (Direct Cost: ¥1,200,000)
Keywordswater diversion project / regulation of water uses / multi-purpose dam / construction expense / compensation accompanying the submergence / life-changing compensation / traditional irrigation system / environmental decay / 技術的協定 / 費用分担 / 分水操作 / 水利調整 / 貰水慣行 / 分水事業 / 地域対応 / 地域対立 / 多目的ダム / 水利調節 / 生活立直し補償
Research Abstract

As the results of our research on realizing conditions of water diversions for Dozan River and Yoshino River, we have clarified the following five points.
(1) Since there was a problem of water shortage in both areas, water diversion projects were planned since Edo period. However, they were never realized because of opposition by people of lower river area, having troubles with water rights.
(2) Water diversion project was finally realized after the World WarII,adjusting the project to give more preference to people of lower river area by constructing a multi-purpose dam, reducing their expense and having the government be responsible for water management.
(3) The water diversion of Yoshino River is different from the one of Dozan River in two ways : three dams were constructed in order to maintain agricultural water for Kii plain ; water facilities were integrated.
(4) What made dam construction possible was a life-changing compensation program which includes : general compensation, development of new villages and maintanance of existing villages. This type of program was successful in construction of Yanase dam and Tsuburo dam.
(5) After Yoshino and Dozan Rivers'water diversion, the traditional agricultural irrigation system was improved by increasing the supply of water in the areas. However, in case of Dozan River, the water diversion reinforced a growth of paper/pulp industries which lead to such environmental decay as air and water pollution.

Report

(3 results)
  • 1994 Annual Research Report   Final Research Report Summary
  • 1993 Annual Research Report
  • Research Products

    (2 results)

All Other

All Publications (2 results)

  • [Publications] 白井義彦,吉本剛典,羽賀公彦: "愛媛県銅山川分水事業の展開と地域対応" 兵庫教育大学研究紀要. 第14巻. 107-120 (1994)

    • Description
      「研究成果報告書概要(和文)」より
    • Related Report
      1994 Final Research Report Summary
  • [Publications] Yoshihiko SHIRAI, Takafumi YOSHIMOTO and Kimihiko HAGA: "The Development of Water Diversion Project of Dozan River, Ehime Pretfcture and Regional Responses" University of Teacher Education Journal. 14. 107-120 (1994)

    • Description
      「研究成果報告書概要(欧文)」より
    • Related Report
      1994 Final Research Report Summary

URL: 

Published: 1993-04-01   Modified: 2016-04-21  