ELECTRICITY TRADING REFORM, NUCLEAR FUEL CYCLE AND ENVIRONMENTAL PROTECTION : AN INDUSTRIAL ORGANIZATIONAL ANAYSIS
Project/Area Number |
13630082
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
経済政策(含経済事情)
|
Research Institution | KWANSEI GAKUIN UNIVERSITY |
Principal Investigator |
KUWAHARA Hidechika KWANSEI GAKUIN UNIVERSITY, SCHOOL OF ECONOMICS, PROFESSOR, 経済学部, 教授 (60170148)
|
Project Period (FY) |
2001 – 2003
|
Project Status |
Completed (Fiscal Year 2003)
|
Budget Amount *help |
¥2,900,000 (Direct Cost: ¥2,900,000)
Fiscal Year 2003: ¥500,000 (Direct Cost: ¥500,000)
Fiscal Year 2002: ¥1,300,000 (Direct Cost: ¥1,300,000)
Fiscal Year 2001: ¥1,100,000 (Direct Cost: ¥1,100,000)
|
Keywords | ELECTRIC POWER / NUCLEAR FUEL CYCLE / ENVIROMANT / COMPETITION POLICY / ENERGY POLICY / EMISSIONS TRADING in UK / PUBLIC UTILITIES / INDUSTRIAL ORGANIZATION / 環境政策 / 公共料金 / 産業組織論 / 公共事業 |
Research Abstract |
(1)IN MARCH 2000 POWER SUPPLY WAS PARTIALLY LIBERALIZED TO ALLOW POWER PRODUCER SUPPLIERS TO SELL TO EXTRA HIGH-VOLTAGE USERS. REGIONAL COMPANIES ARE ALSO ALLOWED TO BEGIN SELLING POWER TO USERS OUTSIDE THEIR DESIGNATED AREA UNDER COMPETITIVE REGULATORY REFORM. (2)MINTAINING HARMONY WITH THE NATURAL ENVIRONMENT IS ONE OF THE INDUSTRY PREMIER OBJECTIVES. STEADY PROGRESS HAS ALSO BEEN MADE TO CONTROL CARBON DIOXIDE EMISSIONS THROUGH THE IMPLEMENTATION OF NUCLEAR AND LNG THERMAL POWER GENERATION. (3)WHILE MEETING GROWING DEMAND, WE ARE WORKING HARD TO BALANCE THE LOAD CURVE. PEAK LOAD PRICINGAND INVESTMENT STRATEGY HAVE EFFECTIVE POLICIES TO FLUCTUATIONS IN ELECTRISITY CONSUMPTION.
|
Report
(4 results)
Research Products
(16 results)