Budget Amount *help |
¥3,100,000 (Direct Cost: ¥3,100,000)
Fiscal Year 2002: ¥1,300,000 (Direct Cost: ¥1,300,000)
Fiscal Year 2001: ¥1,800,000 (Direct Cost: ¥1,800,000)
|
Research Abstract |
The purpose of this study are as followings. About a wooden house, I arrest the whole of life cycle in which a wooden house is realized, repaired with reasonable interval, and dismantled finally. I make standard amount of supply, disposal, reuse, and recycle about various material clear. I put a life cycle of a wooden house in a field of vision. I take into account these and draw resources circulation model of a wooden house. In 2001, I collected materials about resources circulation characteristic of a wooden house. In particular I collected it mainly on the dismantling of a wooden house and example report about a waste, wood and materials about circulation of quality of wood material, materials about evaluation of resources circulation of a building. And I was related and investigated the dismantling construction that used a method of construction to be special of high-rise steel-frame building. And, with amount such as the manufacturing process or the dismantling body wastes, I made a characteristic of method of construction that was used clear. 2002 took into account result in 2001 and did the next matter. About a wooden house, I built a large frame of resources circulation model. About resources circulation in a wooden house, I collected materials concerned and, about each stage of resources circulation, tried quantitative grasp. I collected materials about the dismantling example of a wooden house and caught amount such as the dismantling scrap wood, reuse and recycling materials, and as the dismantling work. On resources circulation of a building, I did a revue of important articles.
|