The study on seismic risk evaluation and the risk finance for reinforced concrete piers
Project/Area Number |
18560473
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Structural engineering/Earthquake engineering/Maintenance management engineering
|
Research Institution | Musashi Institute of Technology |
Principal Investigator |
YOSHIKAWA Hiromichi Musashi Institute of Technology, Faculty of Engineering, Professor (10220609)
|
Co-Investigator(Kenkyū-buntansha) |
HOSHIYA Masaru Musashi Institute of Technology, Research Institute, Professor (30061518)
NAKAMURA Takaaki Musashi Institute of Technology, Faculty of Engineering, Visiting Professor (60424777)
|
Project Period (FY) |
2006 – 2007
|
Project Status |
Completed (Fiscal Year 2007)
|
Budget Amount *help |
¥3,130,000 (Direct Cost: ¥2,800,000、Indirect Cost: ¥330,000)
Fiscal Year 2007: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2006: ¥1,700,000 (Direct Cost: ¥1,700,000)
|
Keywords | Structural / Seismic engineering / Disaster prevention / Reinforced concrete / Seismic Risk |
Research Abstract |
This study investigated an analytical procedure of seismic risk estimation for reinforced concrete structures and applicability of risk finance as alternative risk transfer. Then numerical simulations of the risk assessment for three types of RC piers were carried out. 1. Seismic risk analysis was conducted in order to quantitatively evaluate damage and loss of reinforced concrete structures under various levels of seismic actions. Part 1 : Structural performance of RC piers Evaluation was first of all calculated by the conventional ways. Part 2 : Seismic hazard curves and multi-events curves at a construction site are examined Part 3 : Assessment of vulnerability and damage for RC piers by means of newly proposed EFM-method were conducted. Part 4 : Finally analytical procedure of seismic risk assessment were established. Then, wizard type software FrameRisk was constructed. 2. Risk Finance Part 1 : Development Methodology of Discounted Seismic Risk Curve. The present value of reduction principal and interest depend on the time when earthquake hits. We proposed an evaluation method of discounted present value of a seismic risk curve in a contract period of investment. Part 2 : A Study of Financial Impact Analysis and Management Accounting for Alternative Risk Transfer The long-term financial strategy based on the financial impact analysis and the management accounting technique is needed to design ART. We investigated the financial impact analysis, and developed the prototype model of management accounting.
|