Budget Amount *help |
¥31,070,000 (Direct Cost: ¥23,900,000、Indirect Cost: ¥7,170,000)
Fiscal Year 2010: ¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2009: ¥6,370,000 (Direct Cost: ¥4,900,000、Indirect Cost: ¥1,470,000)
Fiscal Year 2008: ¥8,580,000 (Direct Cost: ¥6,600,000、Indirect Cost: ¥1,980,000)
Fiscal Year 2007: ¥11,700,000 (Direct Cost: ¥9,000,000、Indirect Cost: ¥2,700,000)
|
Research Abstract |
The purpose of this research is the optimization of the integrated control of building, human and HVAC system. Project included comprehensively the VR and HDR technique, dynamic odor-bottle method, and desiccant HVAC on subject tests. The neural network-applied approximation method was proposed for the simulation model of the multi-split type AC system. The abstraction of scheduler and HVAC devices was suggested to stimulate the open-sourcing of programs and the reclamation of source code.
|