Budget Amount *help |
¥17,420,000 (Direct Cost: ¥13,400,000、Indirect Cost: ¥4,020,000)
Fiscal Year 2021: ¥5,590,000 (Direct Cost: ¥4,300,000、Indirect Cost: ¥1,290,000)
Fiscal Year 2020: ¥5,590,000 (Direct Cost: ¥4,300,000、Indirect Cost: ¥1,290,000)
Fiscal Year 2019: ¥6,240,000 (Direct Cost: ¥4,800,000、Indirect Cost: ¥1,440,000)
|
Outline of Final Research Achievements |
Floating offshore wind turbine design calculations require time history simulation analysis for a large number of design load cases. However, there exist no analysis tools that can be used to design next-generation floating offshore wind turbines equipped with large capacity wind turbines exceeding 10 MW. In order to solve this problem, we developed load analysis software for floating offshore wind power generation based on multibody dynamics and verified it based on the measured values on the actual floating offshore wind turbine.
|