Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2009: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2008: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
|
Research Abstract |
We have analyzed change in visual impression depending on Level-of-detail(LoD) of an object's surface, and developed a real-time representation method for material data to increase noticeability of surface bumpiness considering human visual features. As a result, the method adapts LoD to object surface details and changes rendering technique corresponding LoD, and improves performance around 10-20%. We also added realism to surface dents or grooves without deforming surface geometry, and achieved better perception of the three dimensional surface shape.
|